Wärtsilä has held an operation and maintenance agreement of five years (O&M) with Boto, a subsidiary of the Moroccan mining group.
This agreement involves administering a 23MW captive plant in the Boto Gold project located in East Senegal.
The Boto Gold project, located 88 km from Kédougu, near the borders of Mali and Guinea, will work in six Wärtsilä 32 engines of 2.7MW each and four high -speed diesel generators of 1.5MW each.
Invest in gold
This installation will provide a reliable power for gold mining activities in a remote location, outside the network, supporting Senegal’s mining and energy sector.
The plant includes a personalized optimization plan with the National Plan of Senegal Sénégal Emerent.
The agreement was recorded in Wärtsilä order intake during the second quarter (Q2) of 2025.
The O&M contract covers the operation and maintenance of the engines, the detection of anomalies with AI and the remote operating support designed to guarantee efficiency, optimized fuel consumption and reduced inactivity time.
In compliance with senegal regulations, mining companies must operate their own energy generation facilities in such areas, which requires reliable energy solutions for industrial growth.
The Director of International Operations of the Managem Group, Driss Mounji, said: “This association is a great step forward for our Operations in Senegal. The personalized approach of Wärtsilä and advanced digital solutions give us confidence to produce gold in a more reliable and efficient way, while establishing the basis for future renewable integration.”
Wärtsilä Energy Africa Energy Business Director Marc Thiriet said: “Supporting the management group on their first self -setting plant reflects our commitment to deliver resistant and profitable energy to the Mining Sector of Africa.
“This project demonstrates that the deep understanding of Wärtsilä of the Energy Panorama of Senegal and our ability to operate in alignment with the objectives of industrial growth and energy independence of the country. Wärtsilä flexible engine technology allows the future integration of solar energy, supporting the broader impulse of Senegal towards renewable energy and sustainable industrialization.”
The project also aims to generate employment in the Kédougou region involving local staff.
“Wärtsilä ensures a five -year energy plant agreement for the Golden Boto mine” was originally created and published by Power Technology, a brand owned by Globaldata.
Information on this site has been included in good faith only for general informative purposes. It is not intended to ascend to the advice on which you must trust, and we do not give any representation, guarantee or guarantee, whether express or implicit in its precision or integrity. You must obtain professional or specialized advice before taking or refraining from any action on the basis of the content on our site.
(Tagstotranslate) Captive Power Plant (T) Boto Gold Project (T) Wärtsilä (T) Boto (T) Energy Plant (T) Operation and Maintenance Senegal (T)
Source link